Excavation
We over-dig the pool by 12" to ensure optimal Gunite application, resulting in a durable 9-11 inch thick floor. By comparison, many other companies only over-dig by 9", leaving floors just 6 inches in thickness.
Install Plumbing and Lighting
Installation of plumbing and electrical lines.
FAQs
How much do you over dig at excavation?▼
We over-dig the pool by 12" to ensure optimal gunite application, resulting in a
durable 9-11 inch thick floor. By comparison, many other companies only over-dig by 9", leaving floors just 6 inches in thickness.
Do you provide deep heat plumbing in the pool?▼
We install a dedicated return line at the bottom of the pool to deliver faster and more consistent heating. In contrast, many other companies rely solely on jet heating to warm the pool. Ultimately leading to uneven temperature distribution.